Due to the scheduled reconfiguration work of the LOA server, there is a technical break. The work is aimed at optimizing the coding on the server-cluster line.
The deadline for completion of works – 14.04, at 23:00.
Due to the scheduled reconfiguration work of the LOA server, there is a technical break. The work is aimed at optimizing the coding on the server-cluster line.
The deadline for completion of works – 14.04, at 23:00.